Reviewed all NDT inspections procedures and witnessed the validation and production work for the RAVN pipeline project on behalf of Qlever. Welds were inspected using the SHAW AUT inspection system.
Pipeline runs from the RAVN platform to the A6-A platform and has a length of 18 kilometer. The diameter for the oil line is 8.625″ with a 3,5inch Gas line piggybacked. The water-depths ranged between 43 and 49 meter. Allseas performed the pipe lay, trenching and FGT